(860) 990-2332
DMTileLLCProfessional Tile Installation

Shower Waterproofing & Tile Installation in New Britain & Central Connecticut

Schluter-KERDI and liquid-applied systems behind every shower we tile — beauty on the surface, protection underneath.

Large-format stacked shower wall tile set over bonded waterproofing by DM Tile LLC in Westport CT

24hr

Estimate Turnaround

1-Yr

Workmanship Warranty

5.0

Google Rating

Service Details

Shower Waterproofing & Tile Installation Done Right the First Time

A shower is a wet-room system, and the tile is only its finish layer. We build fully bonded waterproof showers using Schluter-KERDI membrane, prefabricated foam pans and curbs — or liquid-applied membranes where geometry calls for it. Every drain, seam, corner and penetration is detailed before the first tile is set.

Inside the system we correct slope to drain, plumb the walls and reinforce niches, benches and shampoo shelves so they are tiled, functional and leak-free. On the surface we set porcelain or ceramic with consistent joints and seal the movement transitions that grout alone can never survive.

The difference shows up years later: no moisture behind the walls, no swollen drywall on the other side, no musty smell — just a shower that still looks new and protects the structure around it.

Schluter-KERDI bonded waterproofing systems

Prefabricated or mud-built pans with correct slope

Flood-tested before tile goes on

Tiled niches, benches & curb details

Mold-resistant backer throughout

Leak-free guarantee in writing

Frequently Asked Questions

Shower Tile Questions, Straight Answers

Tile and grout are not waterproof — they never have been. The membrane behind them is what keeps water out of your wall cavity. A beautiful tile job over a bad waterproofing system fails within a few years; a correct system lasts decades.

A typical tub-to-shower conversion or full shower rebuild runs 4–6 working days: demolition and prep, waterproofing and flood test, then tile, grout and silicone. We keep the bathroom sealed and broom-clean every evening.

Yes — tub conversions are among our most requested projects. We rebuild the drain position, slope the pan correctly, waterproof the full wet area and tile it, adding glass, niches and benches to your plan.

Every bonded system is plugged and flood-tested for 24 hours before tile. If a drop moves, we find it while it is still inexpensive to fix — not after your tile is on the wall.

Still have questions? Call us at (860) 990-2332

Book Your Shower Tile Project Today

If you are in New Britain, Berlin, Newington, Farmington, West Hartford, Glastonbury or a nearby Central Connecticut town and need tile installation, bathroom remodeling, shower waterproofing, backsplash work, or floor tile installation, contact DM Tile LLC today. Free estimates available.